GrabCAD 模型信息
14-Cement Silos · 模型 270830
The cement comes into the silo No 1 via a transport pipe. There is a change over gate which takes the cement, to silo No. 2. There are manholes, Nivo pilot (Level indicator), Silo pilot (Maximum Level indicator), over /under pressure valve, sounding pipes and filter with fan etc. on the silo top. There are 6 outlets in the silo from which the cement comes to a common tank. Then it goes to the Air slide and then to the packing plant.
- 格式
- STEP / IGES、AutoCAD、Other、Rendering
- 分类
- Construction、Energy and Power、Industrial design
- 标签
- 未标注
- 数据更新
- 2026-11-02T18:49:17Z