GrabCAD 模型信息
15-Cement Packing Plant · 模型 270829
The Cement is taken by a Bucket Elevator into a bin via a spring loaded vibratory Conveyor. From here it goes to a packer having 12 outlets. It is packed into sacs of 50 kgs each. There is a spill hopper & screw conveyor for any dust that spills while filling the cement sacs. The sacs then go on conveyors to be transported into trucks and wagons.
- 格式
- STEP / IGES、Other、AutoCAD、Rendering
- 分类
- Educational、Energy and Power、Industrial design
- 标签
- 未标注
- 数据更新
- 2026-11-03T18:54:43Z