Ammonia Storage Tank Bottom Plate & First Course Replacement Project 模型预览

GrabCAD 模型信息

Ammonia Storage Tank Bottom Plate & First Course Replacement Project · 模型 135470

作者:Aygün Karaköse

37227 m³ Ammonia Storage Tank Bottom Plate and First Course Replacement Project — one of the largest storage tank projects in Türkiye. The tank inspection was performed according to American Petroleum Institute API 653 standards, and the tank design was completed in accordance with American Petroleum Institute API 620 requirements. For the first course shell replacement, the tank was supported by a system consisting of 60 hydraulic jacks. The hydraulic jack support system was designed in SolidWorks The project included tank lifting operations, bottom plate replacement, first course renewal, assembly, welding activities, and QA/QC inspections. All welding inspections and controls were successfully completed, and the system was implemented and commissioned on site.

格式
STEP / IGES、Rendering
分类
Components、Educational、Industrial design
标签
tankrepair、welding、solidworks、api653、ammoniatank、storagetank、mechanicalengineering
数据更新
2026-10-19T04:20:52Z
前往 GrabCAD 查看

CADSEEK 是第三方中文模型检索工具,与 GrabCAD 无隶属或官方合作关系。模型文件、许可与最终详情以 GrabCAD 原始页面为准。