foundation projekt: areale 模型预览

GrabCAD 模型信息

foundation projekt: areale · 模型 93509

作者:Detlef Schmidt

... here the preliminary studies on the foundation project: areale. Please note: the bows are 18 meters apart - and the edge length of the projected object is 156.6 meters. each carrier column in the model here - is 1.4 meters thick, bricked. this is an attempt to determine the carrier structures of the required - bricked carriers - simplified. the elaborations above are the shaft characteristics: later water supplies will be bricked up: the width is 6 meters - the depth here is 1 meter - later 3 meters. this is for the flowing water, the supply structure of the hall structure with quickly flowing water, which also characterizes the room thermics - ie the air movement in the hall structure. The building itself has a depth of 6 floors (in the ground!) and a height above these 6 floor levels - from up to 16 floors, which are between 18-24 meters high! the outside surfaces are brick cavities - so-called load bodies that are planted (vegetation) and whose water cycles are predetermined. the hall construction heights are reduced at the bottom of the earth - at the beginning of the ground and very high at the top - and in between in the middle, moderate. step, igs

格式
Rendering、STEP / IGES
分类
Architecture、Construction、Industrial design
标签
未标注
数据更新
2026-10-01T10:36:15Z
前往 GrabCAD 查看

CADSEEK 是第三方中文模型检索工具,与 GrabCAD 无隶属或官方合作关系。模型文件、许可与最终详情以 GrabCAD 原始页面为准。