GrabCAD 模型信息
relocation of shredding equipment · 模型 180328
I didn't do the planning, but I coordinated 100% of the implementation work, I think I have the right to put it that way. I don't agree with the concept, I would have done it differently, but I also have bosses, that's why it was implemented this way. The essence of the project is to feed the material into the shredding machine in a controlled manner, this works after all, but the belt part of the conveyor belt needs to be replaced every year!
- 格式
- STL
- 分类
- Components、Machine design、Miscellaneous
- 标签
- 未标注
- 数据更新
- 2026-09-10T13:34:05Z